Case Studies

Latest News

Case Studies

Community

Buyers Guides

Prefabricated Drainage by PIPEKIT for Dowds Group at St Edmund Hall, Oxford.
Prefabricated Drainage by PIPEKIT for Dowds Group at St Edmund Hall, Oxford.
  • Prefabrication

Prefabricated Drainage by PIPEKIT for Dowds Group at St Edmund Hall, Oxford.

'Using prefabricated drainage stacks made installation quicker and safer.' Barry McAleese, Dowds
Geberit FlowFit Industrial Case Study
Geberit FlowFit Industrial Case Study

Geberit FlowFit Industrial Case Study

PIPEKIT Supplies Air2Heat for Air Source Heat Pump Installation
PIPEKIT Supplies Air2Heat for Air Source Heat Pump Installation

PIPEKIT Supplies Air2Heat for Air Source Heat Pump Installation

    AIR2HEAT LTD SELECTS PIPEKIT TO SUPPLY GEBERIT MAPRESS PIPEWORK FOR NEW HOUSE BUILD...
PIPEKIT Supplies Maxglow Ltd In Refurbishment Project At Heathrow Airport Terminal Four
PIPEKIT Supplies Maxglow Ltd In Refurbishment Project At Heathrow Airport Terminal Four

PIPEKIT Supplies Maxglow Ltd In Refurbishment Project At Heathrow Airport Terminal Four

Pipekit has recently supported existing customer Maxglow Ltd in the refurbishment project of a toilet...